Deck Guard Rail Attachment and Bottom Rail Repair

17 guardrail attachment locations and 2 guardrail bottom rail repairs All items to be removed from the deck area by the homeowner/tenant prior to the commencement of work.

  1. Fabricate 17 new attachment bases to match the existing configuration - preprime prior to installation. At each location, perform the following as applicable:
  2. Place protection to the surrounding area.
  3. Remove the lags and save for reinstallation.
  4. Layout for and cut off the bottom portion of the post and dispose of.
  5. Set the new attachment base in place and reinstall the lags.
  6. Cut off the bottom rail and dispose of.
  7. Set the new bottom rail in place.
  8. Weld the repair.
  9. De-slag and grind the weld.
  10. Spot prime and spot paint the edge metal and fastener attachment points.
  11. Remove the protection and clean up.
  12. Remove all debris from site.