17 guardrail attachment locations and 2 guardrail bottom rail repairs All items to be removed from the deck area by the homeowner/tenant prior to the commencement of work.
- Fabricate 17 new attachment bases to match the existing configuration - preprime prior to installation. At each location, perform the following as applicable:
- Place protection to the surrounding area.
- Remove the lags and save for reinstallation.
- Layout for and cut off the bottom portion of the post and dispose of.
- Set the new attachment base in place and reinstall the lags.
- Cut off the bottom rail and dispose of.
- Set the new bottom rail in place.
- Weld the repair.
- De-slag and grind the weld.
- Spot prime and spot paint the edge metal and fastener attachment points.
- Remove the protection and clean up.
- Remove all debris from site.